NX-9600/NX-9610 Series Integrated Services Controller
>
Hardware Installation
> Applying Power to the Controller
Published January 2018
prev
|
next
Print this page
Email this topic
Feedback
View PDF
Download EPUB
Preface
Text Conventions
Platform-Dependent Conventions
Providing Feedback to Us
Getting Help
Extreme Networks Documentation
Introduction
Warnings
Site Preparation
Installation Checklist
Location & Equipment
Additional Recommended Equipment
Cautionary Statements
Safety Instructions for Rack Mount Installations
NX-9600 Series Specifications
Mechanical Specifications
Environmental Specifications
Power Specifications
Power Protection
Hardware Installation
Installing the NX-9600 Series Controller
Applying Power to the Controller
LED Information
Front Panel LEDs
Power Supply Status LED
Gigabit Ethernet Card LEDs
NX-9610 Expansion Module LEDs
Using the NX-9600 Series Command Line Interface
Basic Configuration Using the Management Interface
Regulatory Information
Radio Frequency Interference Requirements - FCC
Radio Frequency Interference Requirements - Canada
Battery Information
Battery Safety Guidelines
Laser Devices
LED Devices
Fiber Optic Module
CE Marking and European Area (EEA)
Statement of Compliance
Japan (VCCI) - Voluntary Control Council for Interference Class A ITE
Korea Warning Statement for Class A ITE
Chinese Warning Statement for Class A ITE
Ukraine
European Waste Electrical and Electronic Equipment (WEEE) Notice
Turkish WEEE Statement of Compliance
China RoHS Compliance
Applying Power to the Controller
Gently press and hold the power button to apply power to the services ontroller.
2. Attach the front bezel between the rack mount brackets on the sides of the services controller.
3. Lock the front bezel.
Note
Keep the front bezel keys and HDD keys in a secure location which can only be accessed by authorized personnel.