Extreme Campus Controller™
>
Controller Installation Guidelines
> Verify the Box Contents
Published April 2021
Search this document
Print this page
Email this page
View PDF
Previous
Next
Preface
Text Conventions
Documentation and Training
Getting Help
Providing Feedback
E2122 Controller Overview
Controller Installation Guidelines
Verify the Box Contents
Mount the Controller
Power Source and Power Supply Information
Connect to a Power Source
Install a Power Supply
Remove a Power Supply
Replace a Power Supply
Initial Network Connection and Configuration
Configure the Management Interface via Console Port
Configure the Management Interface via Management Port
Connect the Data Ports
Install a Transceiver
Regulatory Compliance Information
Federal Communications Commission (FCC) Notice
Industry Canada, Class A
Japan (VCCI) - Voluntary Control Council for Interference Class A ITE
BSMI EMC Statement - Taiwan
Hazardous Substances
European Waste Electrical and Electronic Equipment (WEEE) Notice
Supplement to Product Instructions
Verify the Box Contents
When you receive the controller, ensure that the box contents are as follows:
One
E2122
Quick Reference
One
Extreme Campus Controller
E2122
unit
Two shipping lock screws
One AC power cord bracket and retention strap kit
One rack mounting kit
One front panel faceplate
One rail kit installation instruction sheet
Note
The power cord needs to be purchased separately for the respective deployment country. They can be ordered at
https://www.extremenetworks.com/powercords/
.