Install the Switch

Before you attempt to install or remove an Extreme Networks switch, read the precautions in Safety Considerations for Installation.

Extreme Networks switches fit into standard 19-inch equipment racks.

A four-post rack-mounting kit is provided with the switch. A two-post kit can be ordered separately.

The installation process includes the following tasks:

  1. Prepare to install the switch. See What You Will Need for the Installation.
  2. Install the switch in the rack. See Install the Switch.
  3. Install optional components: optical transceivers and cables. See the instructions in Install Optional Components.
  4. Power up the switch. See Turn on the Switch .
  5. Connect network interface cables. See Connect Network Interface Cables .
  6. Perform initial network connection and configuration. See Activate and Verify the Switch.