You can upgrade a single-node deployment
of XCO to a multi-node deployment.
Before you begin
- Ensure that the single node is running EFA 2.5.5 or later. For more information,
see and
.
- Ensure that you have completed the high-availability prerequisites in .
About this task
The upgrade process takes approximately 15 - 25 minutes. During the upgrade process, XCO
services remain down.
The upgrade process backs up the XCO system to recover data if the
upgrade fails.
Note
XCO management Interface must have both IPv4 and IPv6 address configured. Adding
IPv6 address is optional while IPv4 is mandatory during sub interface
creation.
Procedure
-
Download the image
(*.tar.gz).
-
Verify the PGP signature as described in article 48172 on the Extreme Portal.
-
Untar the image.
device# tar -xvzf efa-v3.x.x.tar.gz
-
Change to the XCO directory.
-
Run the deployment script.
device# source deployment.sh
The XCO Installer begins in a series of dialogs.
-
When prompted, select Multi-node
deployment and OK.
Tip
Use arrow keys to move between
options. Press the space bar to select an option.
-
When prompted, enter the peer IP
address or FQDN of the other node in the cluster.
-
When prompted, enter the virtual
IP address for the cluster.
-
When prompted, enter the virtual
IPv6 address for the cluster.
- Select Yes and then provide the virtual IPv6
addresses.
- Select No to ignore this optional step.
-
When prompted to configure
additional IP addresses for a health check, take one of the following
steps.
- Select Yes and
then provide the IPv4 or IPv6 addresses.
- Select No to
ignore this optional step.
-
When prompted to configure additional management IP networks, take one of the
following steps.
You can add only one management IP networks
during upgrade. After the upgrade, you can add more than one management IP
networks.
- Select Yes and
then provide the following information when prompted. Repeat as often as
necessary.
- Sub-interface
name, which is a unique name that contains no more than 11
characters, no white space, and no % or /
characters.
- ID of the VLAN
that the management network uses to tag traffic. Valid values
range from 2 through 4090.
- IP subnet address
in CIDR format. The subnet must not overlap with any IP subnet
that you have already provided.
- An IPv6 address
is optional, but an IPv4 address is mandatory.
- Select No to
ignore this optional step or when you have finished entering network
information.
-
When prompted to configure
additional management IP network routes, take one of the following steps.
- Select Yes and
then provide the following information when prompted. Repeat as often as
necessary.
- Target network IP
address in CIDR format
- Source IP address
for outbound traffic
- Next-hop or
gateway IP address through which access to the destination
network is provided
- Select No to
ignore this optional step or when you have finished entering route
information.
As the installation proceeds,
messages display showing the installation progress, including when deployment is
complete.
-
Verify the upgrade.
-
(If applicable) On the
SLX device, run the show efa
status command to see details of the installation and the
state of services.
-
From the XCO command line, run the sudo efactl
status command to see the status of nodes, pods, and
services.
-
From the XCO command line, run
the efa
status command to ensure that status of all the nodes are
up.