Mounting the AP using the WS-MBI-DCFLUSH
Bracket to a Flat T-bar
About this task
The optional WS-MBI-DCFLUSH (#37211) bracket
can also be used for T-bar installations without the main mounting
bracket.
Pre-Installation checklist:
T-bar width must be 9/16” (15mm), 15/16” (24mm), 1.5” (38mm).
T-bar bottom must be flat all the way across.
T-bar minimum base thickness: N/A; must be structurally sound.
T-bar maximum base thickness is 0.080” (2mm).
Ceiling tile must be flat all the way across.
Maximum ceiling tile protrusion allowed is 0.015” (0.38mm).
Procedure
Remove the ceiling panels around the
drop ceiling T-bar rail.
Open the movable sliding part of the
T-bar to give the stationary and slider T-bar more space.
Hook the stationary end of the T-bar
bracket onto the T-bar.
Tilt the T-bar up slightly in such a way that you are holding the stationary and
movable sides of the bracket. Squeeze the bracket parts together until you hear the T-bar
locking tab click into place.
Slide the T-bar ceiling mount bracket base into the back of the access point. The
locking tab fits into a groove in the outside of the AP.
Hold the AP and rock it back and forth to ensure that it is securely mounted.
Attach the Ethernet cable‘s RJ45 connector to the LAN1/GE1 port and place the ceiling
tile back in place.