What You Will Need for the
Installation
Ensure that you have followed the guidance in Preparing for the Installation and ensure that you have the appropriate people and tools on hand.
Installing Extreme
Networks switch routers is easiest when there are two people to maneuver the
device and attach mounting hardware.
Provide enough space in front of and behind the switch so that you can service it easily.
Allow a minimum of 122 cm (48 in) in front of the rack and 76 cm (30 in) behind the rack.
If your device has internal power supplies, make sure they have the same airflow direction as
the fans in the device.
Check SLX 9740 Switch Router Quick
Reference to see what hardware is provided in the device packaging. Most Extreme
Networks switches come with the following hardware:
- Two rack mounting brackets (ears) adaptable for either a front-mount or mid-mount
installation.
- Two long mounting brackets (rails) or slider kits for mounting in a four-post
installation.
- Screws for attaching mounting hardware to the switch housing.
You need the following additional tools and equipment. These are not provided with your
device:
- Screwdriver for securing the rack
mounting screws.
- #2 Phillips screwdriver to attach bracket
screws that are provided with the device. We recommend using a magnetic screwdriver.
- AC power cord. For devices with removable
AC power supplies, a separate power cord is needed for each installed power supply. The
cord must meet the requirements listed in Power Cord Requirements for AC-Powered Switches and AC Power Supplies.
- ESD-preventive wrist strap for installing
optional ports at the back of the device.
- Grouding lugs.