5420 Series Hardware Installation Guide
>
Replace Fan Modules
> Pre-Installation Requirements
Published September 01, 2024
Search this document
Print this page
Email this page
View PDF
Previous
Next
Preface
Audience
Text Conventions
Documentation and Training
Getting Help
Providing Feedback
ExtremeSwitching 5420 Series Overview
5420F-8W-16P-4XE Switch Features
5420F-24P-4XE Switch Features
5420F-24S-4XE Switch Features
5420F-24T-4XE Switch Features
5420F-16MW-32P-4XE Switch Features
5420F-16W-32P-4XE Switch Features
5420F-48P-4XE Switch Features
5420F-48P-4XL Switch Features
5420F-48T-4XE Switch Features
5420M-24T-4YE Switch Features
5420M-24W-4YE Switch Features
5420M-16MW-32P-4YE Switch Features
5420M-48T-4YE Switch Features
5420M-48W-4YE Switch Features
Secure Boot
Power Supplies for Use with Your Switch
150 W AC Power Supply
600 W AC PoE Power Supply
920 W AC PoE Power Supply
1200 W AC PoE Power Supply
2000 W AC PoE Power Supply
Minimum Software Version for Power Supplies on 5420 Series Switches
Site Preparation
Plan Your Site
Operating Environment Requirements
Meet Building and Electrical Codes
Set up the Wiring Closet
Control the Temperature
Control the Humidity Level
Protect Your System from ESD (Electrostatic Discharge)
Rack Specifications and Recommendations
Mechanical Recommendations for the Rack
Ground the Rack
Provide Adequate Space for the Rack
Secure the Rack
Evaluate and Meet Cable Requirements
Label Cables and Keep Accurate Records
Install Cable
Handle Fiber Optic Cable
Cable Distances and Types
Use RJ45 Connector Jackets
Prevent Radio Frequency Interference (RFI)
Meeting Power Requirements
Requirements for PoE Devices
Power Supply Requirements
Requirements for Power Cords
UPS (Uninterruptible Power Supply) Requirements
Select a UPS
Calculate Volt-Amperage Requirements
Provide a Suitable UPS Transition Time
Follow Applicable Industry Standards
Build Stacks
Introduction to Stacking
Build Basic Stacks
Slot Numbers in Stacks
Primary/Backup Switch Redundancy
SummitStack Topologies
Ring Topology: Recommended for Stacking
Daisy Chain Topology: Not Recommended for Stacking
SummitStack Terms
Planning to Create Your Stack
Enable and Disable the Stacking-Support Option
Recommendations for Placing Switches for Stacked Operation
Recommendations for Configuring Stacks
Combining Switches from Different Series
Select Stacking Cables
Using the Extreme Stacking Tool
Set up the Physical Stack
Connecting the Switches to Form the Stack Ring
Examples of Valid Stacking Configurations
Example: Basic Stack with Four Switches
Example: Basic Stack with Eight Switches
Example: Stacked Switches across Several Racks
Connect Your Stack to the Management Network
Installing Your Switch
Safety Considerations for Installing Switches
What You Will Need for the Installation
Attach the Switch to a Rack or Cabinet
Install Optional Components
Install Internal AC Power Supplies
Connect Network Interface Cables
Turn on the Switch
Activate and Verify the Switch
Connect the Switch to a Management Console
Log in for the First Time on Switch Engine
Configure the Switch's IP Address for the Management VLAN
Change the Switch OS via the Bootloader Menu
Change the Switch OS via the Startup Menu
Log In for the First Time on Fabric Engine
Replace Internal AC Power Supplies
Replacing a 150 W AC Power Supply
Replacing a 600 W, 920 W, 1200 W, or 2000 W AC PoE Power Supply
Replace Fan Modules
Pre-Installation Requirements
Airflow Direction Requirements
Replace a Fan Module
Monitoring the Device
5420 Series Switch LEDs
Technical Specifications
Extreme 5420 Series Technical Specifications
Acoustic Noise and Fan Speed
CPU, Memory Specifications
Mean Time Between Failures
Power Specifications
Environmental
Standards
Power Cord Requirements for AC-Powered Switches and AC Power Supplies
Console Connector Pinouts
Safety and Regulatory Information
Considerations Before Installing
General Safety Precautions
Maintenance Safety
Fiber Optic Ports and Optical Safety
GBIC, SFP (Mini-GBIC), QSFP+, XENPAK, and XFP Regulatory Compliance
Cable Routing for LAN Systems
Install Power Supply Units and Connect Power
Selecting Power Supply Cords
Battery Notice
Battery Warning - Taiwan
EMC Warnings
Japan (VCCI Class A)
Korea EMC Statement
Pre-Installation Requirements
You need a 1/4-inch flat-blade screwdriver to replace a fan module.
Caution
Be sure to finish the replacement procedure promptly. The switch could overheat if left without cooling for an extended period.