Set up the Physical Stack

After you have installed the individual switches (see Install Your Switch), follow these steps to create the physical stack.

  1. Connect the switches that will form the stack.See Connect the Switches to Form the Stack Ring.
  2. Connect the switches to your management network. See Connect Your Stack to the Management Network.

After setting up and connecting the switches, perform software configuration for the stack. See "Configuring a New Stack" in the Switch Engine User Guide for your version of the Switch Engine operating system.