Installation Workflow

Use the information in the following table to help you install your controller out of the box.

Table 1. Installation Work flow
Steps Action Purpose
1

Verify the box contents.

Confirm that your controller arrived complete.
2 (Optional) Install a redundant power supply unit. Install a backup power supply unit. The controller ships with a power supply unit installed, but you can add a second one.
2 Connect to a power supply. Connect the ExtremeCloud IQ Controller E3125 to a power source.
3 Configure the controller. Do one of the following: Configure the following settings:
  • Admin Password

  • Host Attributes Settings

  • Time Settings

  • SNMP Settings

  • Data Plane Settings

4 Connect the network cables. Do one of the following: Establish a network connection.