Verify the Box Contents

About this task

The ExtremeCloud IQ Controller E3125 ships with everything needed for a basic installation. Confirm that you have received the following items before you install your controller.

Note

Note

The power cord needs to be purchased separately for the respective deployment country.

Procedure

  1. Verify that the box contains the following items:
    • One E3125 Quick Reference Guide
    • One ExtremeCloud IQ Controller E3125 unit
    • Two shipping lock screws
    • One AC power cord bracket and retention strap kit
    • One rail mounting kit
    • One rail kit installation instruction sheet
  2. Inspect the controller for any physical damage.
    Contact Extreme Networks Support Portal if there is any damage.