Installation Site Requirements

Ensure that the installation site has a minimum of 15 cm (6 in.) of clear wall space at the top, bottom, left side, and right side of the mounting bracket. This minimum clearance allows for proper airflow, space for cabling the ports, and space for replacing power supplies.

Note

Note

You must manage the port cables to ensure that the air vents are not blocked.