Install Your Switch

Before you attempt to install or remove an Extreme Networks switch, read the precautions in Safety Considerations for Installation.

Extreme Networks switches fit into standard 19-inch equipment racks. A two-post rack-mounting kit is provided with the switch.

The installation process includes the following tasks:

  1. Prepare to install the switch.
  2. Mount the switch, or install the switch in the rack.
  3. Connect network interface cables.
  4. Install optional components: optical transceivers and cables.
    See the instructions in Install Optional Components.
  5. Power up the switch.
  6. Perform initial network connection and configuration.