Mounting the AP using the Main Mounting
Bracket to a Flat T-bar
The AP can be mounted on a t-bar using the mian mounting bracket
that is shipped with the unit.
Pre-Installation checklist:
T-bar width must be 15/16” (24mm).
T-bar bottom must be flat all the way
across.
T-bar minimum base thickness: N/A; must
be structurally sound.
T-bar maximum base thickness:
0.055”.
Ceiling Tile must be flat all the way
across.
Remove the ceiling tiles, push and
rotate the main mounting bracket onto the T-bar in such a way that the center angled
locking tabs of the main bracket gets attached to the T-bar.
Hold the AP and rock it back and forth
to ensure it is securely mounted.
Replace the tiles.
Attach the Ethernet cable‘s RJ45 connector to the LAN1/GE1 port.