Extreme Networks
Extreme 8730 Installation Guide > Safety and Regulatory Information >
Extreme Networks, Inc. July 01, 2025

Search this documentPrint this pageEmail this pageView PDFPrevious
  • Introduction to the Extreme 8730 Installation Guide
    • Text Conventions
    • Documentation and Training
    • Help and Support
    • Send Feedback
  • Extreme 8730 Overview
    • 8730 Series Switch Features
  • Manage Your Switch
  • FEC Configuration Support
  • Fan Modules for Use with Your Switch
    • Fan Modules
  • Power Supplies for Use with Your Switch
    • 1600 W AC Power Supplies
    • 1600 W DC Power Supplies
  • Site Preparation
    • Plan Your Site
    • Operating Environment Requirements
      • Meet Building and Electrical Codes
      • Set Up the Wiring Closet
      • Control the Temperature
      • Control the Humidity Level
      • Protect Your System from ESD (Electrostatic Discharge)
    • Rack Specifications and Recommendations
      • Mechanical Recommendations for the Rack
      • Ground the Rack
      • Provide Adequate Space for the Rack
      • Secure the Rack
    • Evaluate and Meet Cable Requirements
      • Label Cables and Keep Accurate Records
      • Install Cable
        • Handle Fiber Optic Cable
        • Cable Distances and Types
      • Use RJ45 Connector Jackets
      • Prevent Radio Frequency Interference (RFI)
    • Meet Power Requirements
      • Power Supply Requirements
      • Power Cord Requirements
      • UPS (Uninterruptible Power Supply) Requirements
        • Select a UPS
        • Calculate Volt-Amperage Requirements
        • Provide a Suitable UPS Transition Time
      • Follow Applicable Industry Standards
  • Install Your Switch
    • Safety Considerations for Installation
    • What You Will Need for the Installation
    • Attach the Switch to a Rack or Cabinet
    • Install Optional Components
    • Install Internal Power Supplies
    • Connect Network Interface Cables
    • Turn on the Switch
  • Activate and Verify the Switch
    • Connect to a Management Console
    • Login for the First Time on Extreme ONE OS
    • Configure the Switch's IP Address for the Management VLAN
  • Remove and Replace Components
    • Remove a Device From a Rack
      • Remove a Device from a Four-Post Rack
      • Remove a Device from a Two-Post Rack
    • Replace Internal Power Supplies
      • Airflow Direction Requirements
      • Replace a 1600 W Internal AC Power Supply
      • Replace a 1600 W Internal DC Power Supply
    • Replace Fan Modules
      • Airflow Direction Requirements
      • Replace a Fan Module
  • Monitor the Device
    • System Status LEDs
    • 1G/10G SFP+ Management Port LEDs
    • QSFP-DD Port and Sub-channel Selector LEDs
    • QSFP28 Port LEDs
    • Power Supply LEDs
  • Technical Specifications
    • Extreme 8730 Technical Specifications
    • Acoustic Noise and Fan Speed
    • CPU and Memory
    • Mean Time Between Failures
    • Power Specifications
    • Environmental
    • Standards
    • EMI/EMC Standards
    • Power Cord Requirements for AC-Powered Switches and AC Power Supplies
    • Console Connector Pinouts
  • Safety and Regulatory Information
    • Considerations Before Installing
    • General Safety Precautions
    • Maintenance Safety
    • Fiber Optic Ports and Optical Safety
      • GBIC, SFP (Mini-GBIC), QSFP+, XENPAK, and XFP Regulatory Compliance
    • Cable Routing for LAN Systems
    • Install Power Supply Units and Connect Power
    • Select Power Supply Cords
    • Battery Notice
    • Battery Warning - Taiwan
    • EMC Warnings
    • Japan (VCCI Class A)

9039307-00 Rev AA
Search this documentPrint this pageEmail this pageView PDFPrevious
  • © 2024 Extreme Networks.
  • Legal
  • Privacy and Cookies Policy