For other pole diameters, provide your own stainless
steel cable clamp. The band must be ½” (12.7mm) wide.
Attach the AP to the “H” bracket on the side that does not have the PEM
stand-offs. Tighten the four screws to a torque of 12.0 in-lbs.
Using four M4 screw assemblies, attach the pole bracket onto the “H” bracket.
Tighten the screws to 12.0 in-lbs.
Position the pole mount bracket onto the AP mounting bracket.
Attach the two cable clamp to the pole bracket. Open the cable clamp by turning
a flat bladed screwdriver counterclockwise. Then, insert the non-clamp end into
the pole bracket through the holes.
Note
It is easier to install both clamps before attaching to the pole.
Put the metal band around the pole and insert it into the clamp.
Turn the clamp screw clockwise, tightening the band around the pole.
Secure the AP to the pole by tightening the stainless steel tie back
strap.