Installation Site Requirements

If you plan to cable your SSA with SFP+ pluggable transceivers, you might need to have 7.5 cm to 10 cm (3 to 4 in.) of clearance on the switch I/O port side of the SSA.

See Environmental Guidelines for ExtremeSwitching Products for environmental guidelines relating to the installation.

The installation site must be within reach of the network cabling and must meet the following requirements:

  • Appropriate grounded power receptacles must be located within 2 m (7 ft) of the site.
  • A temperature of between 5°C (41°F) and 40°C (104°F) must be maintained at the installation site with fluctuations of less than 10°C (18°F) per hour.
Caution

Caution

To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the front and rear of the device.

Precaución: Para asegurar una buena ventilación y evitar que el sistema se sobrecaliente, deje un espacio mìnimo de 5.1 cm (2 pulgadas) con respecto el anverso y reverso del aparato.

Warning

Warning

Before rack-mounting the device, ensure that the rack can support it without compromising stability. Otherwise, personal injury and/or equipment damage may result.

Advertencia: Antes de montar el equipo en el rack, asegurarse que el rack puede soportar su peso sin comprometer su propia estabilidad, de otra forma, daño personal o del equipo puede ocurrir.

Warnhinweis: Überzeugen Sie sich vor dem Einbau des Gerätes in das Rack von dessen Stabilität, ansonsten könnten Personenschäden oder Schäden am Gerät die Folge sein.

Avertissements: Avant de monter l'appareil sur le bâti, assurez-vous que l'étagère peut en supporter le poids sans en compromettre la stabilité. Cela pourrait, dans le cas contraire, entraîner des blessures ou des dommages au matériel.

For more information about flat surface installation or rack installation using the mounting brackets installed on the SSA, see Installation.