Installing an E4G-400 Cell Site Aggregation Router
Installing the E4G-400 router involves the following steps.
- Install the router in a rack: mid-mount or front-mount.
- Install an AC or DC power supply and connect it to a power
source.
- (Optional) Install port option cards.
- Connect optional cables and perform initial configuration.
The steps are covered in the following sections.