What‘s Included
Included in the packaging with the E4G-200 cell site router are the following
items:
- Two rack-mounting brackets with eight screws
- Ethernet console cable
- DB-9-to-RJ-45 adapter
- Two pluggable DC terminal block connectors (Dinkle part number
2ESDVM-03P)
Recommended insulation colors are:
- Green, or green with yellow stripe, for the ground
connection
- Red and black for the power and return connections
Have the additional items on hand before you begin the
installation:
- Connection hardware appropriate to the installation site:
- Hardware for connecting the ground wire to the site
grounding point
- Hardware for connecting the power wires to the DC
source
- Stripping tool
- Torque screwdriver and wrench or torque driver with attachments
for tightening screws
- The ground lug requires a 1/4-inch screwdriver tip.
- The screws on the DC power connector require a 1/8-inch
straight screwdriver tip.