Installing the DC Power Supply
After preparing the DC cables, install the DC
power supply (Model 10933 or 10934A) in the E4G-400 router.
-
If necessary, remove a blank panel as shown in
the following figure.
-
Verify that the power supply is right side up, and
slide it into the router.
-
Carefully slide the power supply all the way into
the power supply bay, as shown in the figures below, until the latch snaps into
place.
Caution
Do not slam the power supply into the
router.
Installing a Summit 300 W DC Power Supply
(Model 10933)
Installing a Summit 300 W DC Power Supply
(Model 10934A)
If power supplies are not installed in both power supply bays,
install a cover over the unoccupied bay. The cover is required for maintaining
proper system ventilation and EMI levels.