Securing the Mid-Bracket (3-Inch Flush Mount Assembly)

Note

Note

If you are installing the rack mount rail in a flush mount 7.25-inch rack post or a mid-mount configuration, proceed to Securing the Mid-Bracket (7.25-Inch Flush Mount or Mid-Mount Assembly). Otherwise, continue here.

To secure the mid-bracket to the rail for a 3-inch post flush mount assembly, follow these steps:

  1. Align the mid-bracket (callout 2) with the four rail holes closest to the rail ear (callout 3) for both rails.
    See Securing the Mid-Bracket to the Rail (3-Inch Flush Mount).
    Click to expand in new window
    Securing the Mid-Bracket to the Rail (3-Inch Flush Mount)
    Graphics/ssa_sec_mid_brkt_to_3_in_flush_rail.png
    1 = Four screws from extension rack assembly 3 = Rail ear
    2 = Mid-bracket  
  2. Insert and secure the four screws (callout 1) from the rack mount extension assembly for both rails.