To connect the SSA switch to the power sources, follow these steps:
The system PWR LED, located on the switch I/O port panel, turns ON (green) and the CPU LED turns red until the SSA switch completes its initialization.
It takes less than 30 seconds for the SSA switch to boot up.
Note
If the power-up sequence is interrupted on the SSA switch, it might run an extended diagnostics sequence that takes up to two minutes to complete.When the initialization process is successful, the CPU LED turns green. If the CPU LED does not turn green, refer to Troubleshooting.