Installing a CFP2 Module

You can install or remove CFP2 modules in your switch without powering off the system.
Warning

Warning

CFP2 modules contain Class 1M lasers. Invisible laser radiation can occur when laser connections are unplugged. Do not stare into the beam. This device is compliant with IEC 60825-1 Amendment 2 and CFR21Section 1040.

  1. Remove the CFP2 module from its antistatic container and remove the dust covers from the module optical connector.

    If your module has a protective pad covering the card-edge connector, remove it. Store the antistatic container, dust covers, and card-edge connector protective pad in a clean location from which they can be easily retrieved if you need to uninstall the module.

  2. Remove any rubber dust covers from the port where you are installing the CFP2 module.
  3. Holding the CFP2 module by its sides, insert the CFP2 module into the port on the switch or module. The latch handle should be in the open position, with the handle up.
    Click to expand in new window
    Installing a CFP2 Module (CFP2 LR4 module shown)
  4. Slide the CFP2 module into the port until you hear it click into place. The front of the module should be flush against the front panel of the chassis.
  5. Rotate the handle down 90 degrees to the closed position to secure the CFP2 module in the chassis. The handle should be flush against the front to the module.
    Click to expand in new window
    Installed CFP2 Module (BlackDiamond X8 series switch)

    If you are installing only one CFP2 module, make sure that all unoccupied ports are covered with a rubber dust cover.