To install your equipment successfully, you should plan the site carefully. The site planning process has three major parts:
The physical installation site must meet the following requirements for a safe and successful installation:
After examining your physical site and verifying that all environment requirements are met, evaluate and compare your existing cable plant with the requirements of the Extreme Networks equipment to determine if you need to install new cables.
To run your equipment safely, you must meet the specific power requirements for each switch and external power supply unit installed in the system.
For power specifications of the switches, see the specific switch listings in Technical Specifications.
For power specifications of the external power supplies, see Summit External Power Supplies Technical Specifications.