Installing an EPS-600LS External Power Module

Install one, two, or three EPS-600LS power modules (model no. 10913) in the EPS-C chassis (model no. 10912) to build an external redundant power system for a PoE-capable switch.

A redundant power cable shipped with the EPS-C chassis provides the connection between the external power system and the redundant power input connector on the back of the switch.
Note

Note

An AC power cord is not provided with the EPS-600LS power module. See Power Cord Requirements for AC-Powered Switches and AC Power Supplies for information about selecting a power cord.
Note

Note

Each EPS-C chassis is shipped with a special redundant power supply cord for connection to the Summit switch. Make sure that the EPS-C chassis is installed in the rack system before installing an EPS-600LS unit.