Installing a Summit 750 W AC Power Supply into the EPS-C2
     
    
        
            The EPS-C2 chassis is shipped with slots 2 and 3 covered and slot 1 open. 
            We recommend that you install a power supply first in slot 1, but
                this is not required. You can install power supplies into any of the slots in the
                EPS-C2 chassis. The installation sequence does not affect the performance of the
                power supply units, but empty slots must be covered at all times.

Warning   
To prevent an
                    electrical hazard, make sure that the AC power cord is not connected to the
                    power supply before you install the power supply in the power supply bay.
 
             
            After the EPS-C2 has been installed in a rack, do the following to
                install a 750 W AC power supply in an EPS-C2 chassis: 
         
        
            - 
                If necessary, grasp the two tabs on either side of
                    the slot cover and pull gently to remove it from the front of the EPS-C2
                    chassis.
                
                    Removing a
Blank Panel from the EPS-C2 Chassis
                        
                        
                     
                 
             
            - 
                Verify that the power supply is right side up (there
is a sticker labeled “This Side Up”).
            
 
            - 
                Carefully slide the power supply all the way into
                    the slot in the EPS-C2 chassis (see Installing a 750 W AC Power Supply in an EPS-C2 Chassis). 
            
 
            - 
                Push the power supply in until the latch snaps into place.
                
                    
Caution   
Do not slam the power supply into the
                        chassis.
 
                 
                
                    Installing a 750 W AC Power Supply in an
                            EPS-C2 Chassis
                        
                        
                     
                 
                
                    
Note   
If power supplies are not installed in
                        all three slots, be sure to install a cover over each unoccupied slot.
                        Unoccupied slots must always be covered to maintain proper system
                        ventilation and EMI levels.
 
                 
             
        
        Repeat the procedure to install each
            additional power supply.