Tip
For an easier, automatic way to add/replace a node, see Automatically Adding or Replacing Nodes in a Stack.If you are replacing a node with a different switch type, you must change the stack configuration before the new node can operate. Follow the procedure in Replacing a Node with a Different Switch Type.
Note
If the stack will use MPLS, only the 5520 can act as primary and backup.To replace a node with an identical switch type, follow these steps:
Note
If the primary node was replaced, log into another stack node before entering this command.Note
If the primary node was replaced, reboot the stack by entering the reboot command at the primary node.Note
To verify that the new node became operational, enter the show slot {slot {detail} | detail } command. If the slot shows a Mismatch state, the node was replaced with a different type of switch (see Replacing a Node with a Different Switch Type).