General Practices
The following practices are highly recommended:
- When issuing a
command (such as move management, or renumber), we recommend that you allow the command
to fully complete before issuing the next command. For example, if you reboot a stack
member, verify – using the show port command – that the switch has
remerged with the stack and all ports are joined before issuing the next command.
- When physically removing or relocating a unit, always power down the unit before disconnecting stack cables.
- When reconnecting stack cables, connect them before powering up the unit, if possible. Tighten all connector screws, where applicable, to ensure a good connection.
The following sections provide switch stack configuration scenarios. Most of the scenarios assume at least two switches are connected through their stacking ports.